Specifications include, but are not limited to: 1. This contract shall be for the removal of dried municipal sewer sludge from the Long Beach Industrial Park (LBIP) Sewage Treatment Plant (STP) sludge-drying beds to the Waste Management Pecan Grove Landfill & Recycling Center. 2. Sludge can be moved by hand or mechanical means and if determined to be too damp to haul to the landfill for disposal shall be stored under a designated adjacent building until it is ready to be moved. 3. Any excess excavation into the sludge bed filter material shall be refilled from the adjoining sand storage and graded smooth. 4. There shall be no tracking into the sludge beds except on the concrete runners installed for that purpose. 5. Sludge hauled shall be measured by the cubic yard. 6. Certificates of Liability, Workers' Comp., Vehicle Liability and Contractor's Certificate of Responsibility must be included with each submitted bid. Note: All aforementioned certificates must be presented to HCDC each contractual year, prior to expiration. 7. Material Purchase Certificate (MPC) must be provided to HCDC if project is applicable.