Specifications include, but are not limited to: Bids are invited for the furnishing of materials, equipment, labor, and incidentals necessary to construct an extension to the existing day pier within the Pass Christian Small Craft Harbor. This pier is intended to be constructed on the west side of the existing Day Pier located in the new harbor east of South Market Street. The pier will parallel the bulkhead wall located on the south side of the parking lot extending in a westerly direction. The base bid for the project is to construct 80 lf of pier, 6 feet wide with an additive alternate that will allow the City of Pass Christian to add incremental segments of extensions to the pier in 20 feet lengths. The location of the proposed pier is adjacent to the bulkhead wall, which is partially supported by limestone rip-rap along the toe of the wall. The contractor will be required, at no additional cost to temporarily relocate a portion of the rip-rap, as needed, to allow for access to driving the piles. Replacement of the rip-rap to its original location will be required upon completion of the pier.