Specifications include, but are not limited to: Installation of two (2) production wells, well pumps, piping and appurtenances needed for discharge to an existing water treatment plant break tank. The work includes, but is not limited to, installation of two (2) production wells at an approximate depth of 100-ft; furnishing and installing two new well pumps designed to provide approximately 350-gpm; furnishing and installing approximately 950-ft of new piping, valves, and appurtenances needed to provide connection to the existing water treatment plant Ultra Filtration Break Tank; furnishing and installing new electrical, instrumentation, and controls; integrate new electrical, instrumentation, and controls into the existing SCADA system; sediment and erosion control; and all incidentals and appurtenances.