Specifications include, but are not limited to: construction of 0.237 miles of BRIDGE AND APPROACHES on the WEST MOUND BAYOU ROAD. ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS ITEM QUANTITY UNIT ROADWAY ITEMS: MOBILIZATION LUMP SUM LS CLEARING & GRUBBING LUMP SUM LS REMOVAL OF PRECAST BRIDGE @ STA. 55+02.00 1.00 UNIT BORROW EXCAVATION (F.M.E.) (CONTRACTOR FURNISHED) (CLASS 9) 5,457.000 CY CRUSHED STONE 1,941.000 TON HOT MIX ASPHALT, (ST) (12.5 mm) 622.160 TON HOT MIX ASPHALT, (ST) (19 mm) 222.420 TON GUARD RAIL, W-BEAM 275.000 LF GUARDRAIL, BRIDGE END SECTION TYPE "I" THRIE BEAM 4.000 EA GUARD RAIL, TERMINAL END SECTION 4.000 EA RIGHT-OF-WAY MARKERS (TYPE II) 10.000 EA MAINTENANCE OF TRAFFIC LUMP SUM LS ADDITIONAL CONSTRUCTION SIGNS 0.000 SF 4" WIDE THERMOPLASTIC EDGE STRIPE (CONTINUOUS WHITE) (60 MILS) 0.479 MI 4" WIDE THERMOPLASTIC TRAFFIC STRIPE (SKIP YELLOW) (90 MILS) 0.200 MI 4" WIDE THERMOPLASTIC TRAFFIC STRIPE (CONTINUOUS YELLOW) (90 MILS) 1,494.000 LF THERMOPLASTIC LEGEND (WHITE) (120 MILS) 64.000 LF TWO-WAY YELLOW REFLECTIVE HIGH PERFORMANCE RAISED MARKERS 20.000 EA REFLECTORIZED TRAFFIC WARNING SIGN (ENCAPSULATED LENS) 2.000 EA REFLECTORIZED TRAFFIC REGULATORY SIGN (ENCAPSULATED LENS) 1.000 EA REFLECTORIZED TRAFFIC OBJECT MARKER (ENCAPSULATED LENS) 4.000 EA EROSION CONTROL ITEMS: COMMERCIAL FERTILIZER (13-13-13) 0.409 TON SEEDING 1.090 AC VEGETATIVE MATERIALS FOR MULCH 2.180 TON TEMPORARY SILT FENCE (TYPE II) (AOS 0.15-0.84) 2,530.00 LF WATTLE, 20 IN. 108.000 LF LOOSE RIPRAP (300 LB.) 105.000 TON GEOTEXTILE UNDER RIPRAP, TYPE V, AOS 0.21-0.43 167.000 SY BRIDGE ITEMS: TEST PILES 2.000 EA CONVENTIONAL STATIC PILE LOAD TESTS 0.000 EA 18" PRESTRESSED CONCRETE PILING 1,860.000 LF BRIDGE CONCRETE, CLASS "A" 77.640 CY REINFORCEMENT 14,819.000 LB 19' PRECAST CONCRETE SLAB UNIT