Specifications include, but are not limited to: ITEM QUANTITY UNIT ROADWAY ITEMS: MOBILIZATION LUMP SUM LS REMOVAL OF ASPHALT 6,703.0000 SY EXCESS EXCAVATION (FM) 5,672.000 CY GRANULAR MATERIAL, (FM), (CONTRACTOR FURNISHED) (CLASS 4, GROUP B) (12” THICK) 1,891.000 CY GRANULAR MATERIAL, (FM), (CONTRACTOR FURNISHED) (CLASS 9, GROUP B) (24” THICK) 3,781.000 CY PORTLAND CEMENT (8% BY VOLUME) 3,199.000 CWT SOIL-CEMENT-WATER MIXING (MULTIPLE PASS MIXERS) 5,672.000 SY POLYMERIZED-EMULSIFIED ASPHALT, GRADE CRS-2P 5,558.000 GAL COARSE AGGREGATE COVER MATERIAL, SIZE 6, CRUSHED STONE 110.000 CY SEAL AGGREGATE COVER MATERIAL, SIZE 7, CRUSHED STONE 59.000 CY SEAL AGGREGATE COVER MATERIAL, SIZE 89, CRUSHED STONE 59.000 CY BLOTTER MATERIAL 9.000 CY MAINTENANCE OF TRAFFIC LUMP SUM LS 4" WIDE THERMOPLASTIC EDGE STRIPE (CONTINUOUS WHITE) (60 MILS) 0.879 MI 4" WIDE THERMOPLASTIC TRAFFIC STRIPE (SKIP YELLOW) (90 MILS) 0.247 MI 4" WIDE THERMOPLASTIC TRAFFIC STRIPE (CONTINUOUS YELLOW) (90 MILS) 3,335.000 LF POORHOUSE ROAD RECONSTRUCTION OKTIBBEHA COUNTY