Specifications include, but are not limited to: removal and replacement of the existing sanitary sewer, water main, and storm drainage systems. Work consists of furnishing and installing approximately 12,000 LF of 8-inch to 48-inch gravity sanitary sewer main, 14,000 LF of 4-inch to 16 inch water main, 8,000 LF of 18-inch to 88-inch x 54-inch storm drainage, and all associated manholes, valves, hydrants, etc. Roads, curbs, sidewalks, driveways, etc. disturbed during this work will also be replaced. Location of said work is in Biloxi, Mississippi. The work is generally located south of the existing CSX Railroad Tracks and north Howard Avenue. The work stretches from near Hoxie Street at the western limits to the eastern tip of the Point.