Specifications include, but are not limited to: MnDOT requests responses for Contractor to provide design verification, environmental compliance verification, and contract administration for the TH14 Expansion Design-Build project. MnDOT is seeking design-build verification team positions. The Highway 14 Expansion Design-Build project includes the construction of 12.5 miles of new (four-lane) alignment of Trunk Highway 14, comprising segments 2 and 3 of the larger Trunk Highway 14 expansion effort, from 0.7 miles east of Steele County Road 43 (east of Owatonna) to Highway 56 North (west of Dodge Center). The new alignment will be located south of both the current (two-lane) highway alignment and the existing railroad alignment. This project will involve grading, concrete paving, the construction of multiple new bridges, the demolition of 15 buildings, and the construction of approximately five miles of local roads. Current letting date for the project is August 21st, 2019.