Specifications include, but are not limited to: MOBILIZATION, LUMP SUM 1.00; FIELD OFFICE TYPE D, EACH 1.00; PAVEMENT MARKING REMOVAL, LIN FT 3,938.00; PAVEMENT MARKING REMOVAL, SQ FT 440.00; REMOVE CONCRETE APRON, EACH 4.00; REMOVE MANHOLE OR CATCH BASIN, EACH 5.00; REMOVE CASTING, EACH 1.00; REMOVE SIGN TYPE C, EACH 30.00; REMOVE SIGNAL SYSTEM A, EACH 1.00; REMOVE SIGNAL SYSTEM B, EACH 1.00; REMOVE LIGHT FOUNDATION, EACH 1.00; SAWING CONCRETE PAVEMENT (FULL DEPTH), LIN FT 100.00; SAWING BIT PAVEMENT (FULL DEPTH), LIN FT 824.00; REMOVE PIPE CULVERTS, LIN FT 270.00; REMOVE SEWER PIPE (STORM), LIN FT 140.00; REMOVE CURB & GUTTER, LIN FT 2,308.00; REMOVE CONCRETE PAVEMENT, SQ YD 275.00; REMOVE BITUMINOUS PAVEMENT, SQ YD 20,865.00; REMOVE CONCRETE SIDEWALK, SQ FT 6,162.00; GEOTEXTILE FABRIC TYPE 6, SQ YD 34,386.00; TEMPORARY STREAM DIVERSION SYSTEM, EACH 1.00; EXCAVATION SPECIAL, CU YD 3,371.00; EXCAVATION - COMMON(P), CU YD 20,429.00; EXCAVATION - ROCK, CU YD 10.00; GRANULAR EMBANKMENT (CV), CU YD 6,101.00; SELECT GRANULAR EMBANKMENT MOD 7% (CV)(P), CU YD 12,399.00