Specifications include, but are not limited to: Renovation of Building 23-151 includes new site grading, new water and extended sewer service, bituminous parking area paving with striping, new concrete drives, walks, pads, and stoop slabs with foundations, and new exterior concrete bollards. Building renovations include complete removal of exterior metal panel cladding and replacement with new insulated metal panel wall and roof system. New doors and aluminum windows, translucent skylight system, prefinished metal gutters and downspouts, and snow guards are incorporated into the project. Interior renovations include new toilet rooms, new office, classroom and mechanical spaces. New HVAC systems, domestic water, plumbing fixtures, drain/waste/vent systems, fire sprinkler system, new electrical transformer, switchgear, and lighting is included.