Specifications include, but are not limited to: MOBILIZATION, LUMP SUM 1.00; SAWING BIT PAVEMENT (FULL DEPTH), LIN FT 418.00; REMOVE PIPE CULVERTS, LIN FT 204.00; REMOVE BITUMINOUS PAVEMENT, SQ YD 2,135.00; GEOTEXTILE FABRIC TYPE 6, SQ YD 757.00; GEOGRID, SQ YD 335.00; AGGREGATE SURFACING CLASS 5, TON 573.00; MOTOR GRADER, HOUR 11.00; 0.5 CU YD SHOVEL, HOUR 8.00; 12 CU YD TRUCK, HOUR 8.00; 4.0 CU YD FRONT END LOADER, HOUR 8.00; 8 TON STEEL-WHEELED ROLLER, HOUR 11.00; WATER, M GALLON 20.00; CALCIUM CHLORIDE SOLUTION, GALLON 1,031.00; AGGREGATE BASE (CV) CLASS 5(P), CU YD 190.00; AGGREGATE BASE CLASS 5, TON 164.00; FULL DEPTH RECLAMATION, SQ YD 7,206.00; BASE STABILIZATION (BASE ONE), SQ YD 7,320.00; BITUMINOUS MATERIAL FOR TACK COAT, GALLON 642.00; TYPE SP 9.5 WEARING COURSE MIX (3;C), TON 2,183.00; TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,C), TON 35.00; STRUCTURE EXCAVATION CLASS E(P), CU YD 760.00; GRANULAR BACKFILL (CV)(P), CU YD 491.00; GRANULAR BEDDING (CV)(P), CU YD 60.00; 18" RC PIPE APRON, EACH 4.00; 22" SPAN RC PIPE-ARCH APRON, EACH 6.00; 22" SPAN RC PIPE-ARCH CULV CL IIA, LIN FT 94.00; 18" RC PIPE CULVERT DES 3006, LIN FT 62.00; ADJUST VALVE BOX (SPECIAL), EACH 2.00; MAIL BOX SUPPORT, EACH 19.00; TRAFFIC CONTROL, LUMP SUM 1.00; SEDIMENT CONTROL LOG TYPE STRAW, LIN FT 738.00; RAPID STABILIZATION METHOD 4, SQ YD 761.00; INTERIM PAVEMENT MARKING, LIN FT 7,392.00; 4" SOLID LINE MULTI COMP, LIN FT 1,516.00; 6" SOLID LINE MULTI COMP, LIN FT 4,886.00; 24" SOLID LINE MULTI COMP, LIN FT 14.00; 4" BROKEN LINE MULTI COMP, LIN FT 340.00; 4" DBLE SOLID LINE MULTI COMP, LIN FT 920.00;