Specifications include, but are not limited to: 1. Work shall consist of GAC installation, change-out, maintenance and removal activities that will be scheduled throughout the year on an as needed basis. 2. All installations, change-outs, and removals shall be completed within the timeline stated in the Special Terms and Condition, term number 35, titled Response Time. 3. Coordination by the Contractor is required to allow for ordering the vessel, scheduling an appointment with the property owner, and presoaking the carbon (“float time”) if necessary before installation. 4. The Contractor shall work with the respective MPCA contacts or ordering agency to arrange a time suitable with the property owner to complete the work activities. 5. The ordering agency shall provide the Contractor with a copy of the signed access agreement between the property owner and the ordering agency prior to work activities.