THE MAJOR ITEMS OF WORK ARE: 65" SPAN RC PIPE-ARCH APRON 2 EACH,12X6 PRECAST CONCRETE BOX CULVERT 94 LF,REMOVE GUARDRAIL-PLATE BEAM 488 LF,EXCAVATION - COMMON 2794 CY,10X10 PRECAST CONCRETE BOX CULVERT END SECTION 4 EACH,4" SOLID LINE MULTI-COMPONENT 2084 LF,REMOVE FLAP GATE 2 EACH,SOIL STABILIZATION GEOGRID 514 SY,24" CAS PIPE APRON 2 EACH,FLAP GATE FOR 24" CS PIPE 2 EACH,65" SPAN RC PIPE-ARCH CULVERT CLASS IIA 50 LF,GEOTEXTILE FABRIC TYPE 5 5634 SY,EXCAVATION - SUBGRADE 10071 CY,COMMON EMBANKMENT (CV) 8414 CY,TRAFFIC CONTROL 1 LS,10X10 PRECAST CONCRETE BOX CULVERT 212 LF,INSTALL CONCRETE APRON 2 EACH,58" SPAN RC PIPE-ARCH CULVERT CLASS IIA 50 LF,SAFETY GRATE FOR 65" SPAN RC PIPE-ARCH APRON 2 EACH,MAINT AND RESTORATION OF HAUL ROADS 1 LS,CALCIUM CHLORIDE SOLUTION 5000 GAL,16X10 PRECAST CONCRETE BOX CULVERT END SECTION 2 EACH,60" INTERNAL PIPE JOINT SEALING SYSTEM 3 EACH,SAFETY GRATE FOR 60" RC APRON 2 EACH,SOIL BED PREPARATION 2.8 ACRE