Specifications include, but are not limited to: 1. The Drawings have been organized as three distinct areas of work. One set of Technical Specifications encompasses all three distinct areas of work. 2. Lower Level Zone 3, includes interior construction of a conference room, ancillary spaces and toilet rooms, with a total area of approximately 5,000 square feet, in an existing unoccupied space. 3. Lower Level Zone 4, includes construction of a locker rooms and a multipurpose space, with a total area of approximately 2,500 square feet, in an existing unoccupied space. 4. Upper Level Office Addition, includes construction of four offices, with a total area of approximately 500 square feet, in an existing open office space..