Specifications include, but are not limited to: Site 1 (14 acres) Site Preparation 1) Contractor will disk the site with multiple passes to obtain appropriate seed bed for direct seeding (alternative tillage may be utilized as approved by project manager) Seeding 1) Contractor will provide the following seed mix (seed origin for all species should be as close to SE Minnesota as possible): Black Walnut- 2 bushels/acre Burr Oak- 2 bushels/acre Red oak- 2.5 bushels/acre White Oak- 2 bushels/acre Basswood- 1/4lbs/acre Assorted shrubs (nannyberry, elderberry, dogwood, etc)- 1lbs/acre 2) Contractor will incorporate all seed to proper depth utilizing seed broadcaster, light disk, drag/harrow, or cultipacker (alternative techniques as approved by project manager) Establishment Spraying 1) Contractor will spray the site during 2019 growing season with Transline (1 pint/acre) and Envoy (1 pint/acre) (or approved equivalent). Timing to be approved by project manager 2) FMC staff will complete high mowing as necessary.