Specifications include, but are not limited to: 1.New East Fire Station: three-bay satellite fire station of ~17,500 sf at the northwest corner of Cleveland Road and 191st Avenue NW, estimated at $4 million to $5 million. Refer to attached schematic plans, which should be expected to change as design progresses. Fire Station #3 is expected to start Construction in Spring 2021 and complete late-Winter 2022.2.Approximately 3,800 sf expansion of Fire Station #2 (at the Public Safety Building) to include two new apparatus bays, and the subsequent renovation of approximately 4,000 sf of existing apparatus bay and support spaces into turnout gear storage room, decontamination areas, locker rooms, showers, kitchen, dayroom, etc. Refer to attached schematic plans, which should be expected to change as design progresses. This section of the Work is anticipated to start Construction in late-Summer 2020 and be completed by late-Winter 2021, but this schedule is speculative.3.An expansion of the Police Department Squad Garage of approximately 12,200 sf (at the Public Safety Building), and an interior renovation to improve security and workspace efficiency due to the growth of the department, including the build-out of a 4,000 sf shell space on the second floor. Refer to attached schematic plans, which should be expected to change as design progresses. This section of the Work is anticipated to start Construction in late-Summer 2020 and be completed by late-Winter 2021, but this schedule is speculative.