Specifications include, but are not limited to: Inventory: Vendor shall maintain a local warehouse for inventory to supply any building within the City of Minneapolis. Delivery with a maximum limit of one-day time period is required. Vendor must have a documented drum removal recirculation policy. Service: Onsite testing of all chemicals at each building must be made monthly. Field representatives must analyze treated water for proper treatment concentrations and submit a duplicate of findings to the proper department engineers. Representatives should also have experience and knowledge working with existing chemical feeding systems and chemical feed pumps. Vendor must be able to provide chemical feed pump parts for existing equipment in the City of Minneapolis buildings. Vendor must be a member of the AWT (Association of Water Technologies), and must have at least five (5) certified technologists on staff.