Specifications include, but are not limited to: Renovations to the 2nd floor mezzanine for the construction of a Football Performance Center Recovery Suite. Scope includes minimal demolition, construction of new rooms, floor, wall, ceiling finishes, electrical, and mechanical modifications. The suite will contain the following equipment which will be purchased by the department and installed by the contractor. 1. 2 saltwater float pods. The use of these pods needs to be supervised use. 2. 1 Red-light therapy "bed" (similar to a tanning bed). Athletics to provide a model, with specifications, 3. 1 Hyperbaric chamber. The use of this chamber needs to be supervised. Athletics to provide a model, with specifications, 4. 1 Cryochamber. The use of this chamber needs to be supervised. Athletics to provide a model, with specifications.