Specifications include, but are not limited to: The Project entails the expansion of the Hennepin County Medical Center (HCMC) “Purple” Parking Ramp located on Park Avenue between 6th and 7th Streets South in Minneapolis. The new ramp will have approximately 1,000+ parking stalls, two levels below grade, 9 levels above grade for a total of 11 floors. The Project also includes: • An approximately 30,500 square foot shell space liner building on the street level of the ramp along Portland. This space is for future medical center department space. Fit out of the shell space is not included in this Project. • A skyway link across Portland Avenue to the Thrivent Building • A service dock below grade and improvements to the existing tunnel connection through the existing parking ramp to the existing tunnel under Park Avenue • Two levels of enclosed parking below grade that includes EMS ambulance parking and provides for other operational needs. • Aesthetic exterior application to the existing ramp, interior finishes improvements to the existing ramp elevator lobbies, an improved patient drop-off area, wayfinding, and traffic control enhancements. Digital signage for messaging and wayfinding will be utilized. • The ramp will include sustainability components such as: electric vehicle charging stations, roof top screening utilizing solar paneling, and underground storm water retention. • Both ramps are intended to act as the front door for accessing health services on the HCMC campus.