Specifications include, but are not limited to: The PSC shall be responsible for gathering and verifying all base information required for: 1) proper development of a cost comparison and cost/benefit analysis, and 2) for design of a new roof system replacement of the selected roof system type. Complete Phase 500, 600 and 700 design and construction services. Include Phase 400 service tasks to achieve the stated goals. Identify any required Phase 400 tasks necessary for complete Contract Document development in the PSC’s proposal technical summary. The PSC shall include in their proposal DLARA Plan Review Permit application and Construction Code approval, if required, and all permits and standards required to be met by this project. Include in the reimbursement category of the Phase 500 Proposal cost summary of your proposal the cost of permit fees.