Specifications include, but are not limited to: Remove all existing overhead door panels, rail tracks, coiled springs, emergency hand brake chain, operator and three-button wall station, etc. If during the removal process it is discovered that there is sub-strait ACM, all work is to cease and the ACM is properly abated and removed. An Asbesotos Hazard Emergency Response Act (AHERA) report shall be required and submitted by the City prior to proceeding with any further flooring installation. Contractor shall remove all spoils and debris generated by this work from the project site. The owner will not allow excess spoils to be left on City of Saginaw property at project completion. Contractor shall limit storage of materials and equipment within the project limits. Contractor shall coordinate their activities so as to not interfere with or interrupt City of Saginaw operations and Public access to the facilities. Contractor shall perform daily cleanup of materials and debris generated by their work within the project limits and in public access areas in which they create debris and/or tracking of soil materials.