Specifications include, but are not limited to: Design Build Project: 7.2 mi of hot mix asphalt reconstruction on I-94 with three lanes in each direction; an auxiliary lane will be added on eastbound I-94 between I-94BL and I-196; acceleration/deceleration lengths will be improved on two ramps of the I-196 interchange, I-94BL will be reconstructed from a four lane divided to three lane roadway with a roundabout at the I-94BL and Crystal Avenue intersection; construction of 2 new bridges, 1 bridge replacement, 1 bridge rehabilitation and 2 bridge removals; and the new US-31 freeway from north of Napier Avenue to I-94/I-94BL in the cities of Benton Harbor, Coloma and Watervliet, Berrien County. This project includes a 5 year materials and workmanship pavement warranty, one 2 year warranty on concrete surface coating and one 2 year warranty on bridge coating.