Specifications include, but are not limited to: extension of a 12” water distribution main along the west side of Coolidge Hwy. from immediately north of 12 Mile Rd. to Webster Rd. and westerly to connect to an existing 8” main near Kenmore Rd. The length of the project is approximately 2,700’. Approximately four (4) hydrants and eight (8) gate valves will be required. The existing section of 8” water main on the west side of Coolidge Hwy. that initiates from the valve immediately north of 12 Mile Rd. and terminates at Edwards Ave. will be capped and abandoned in place. The project also includes 12" water main extensions with gate valves on both Morrison Ave. and Edwards Ave. for possible future east/west connections in addition to sprinkler line extensions into the three (3) grass medians in Coolidge Hwy. for future irrigation plans.