Specifications include, but are not limited to: In accordance with the annual cyclical maintenance program, replacement pads are approximately 11'x20' at a nominal depth of 8" to 10”. Camp Grayling personnel will remove all existing pads in preparation for replacement. The Bidder will provide all labor, materials, concrete, and equipment to properly complete the work of replacing the approximately 100 pads and otherwise do all things necessary for or incidental to the performance of work, as set forth below The Contractor must perform the work as detailed below: a) Level the bottom of the holes and compact to 95% maximum density prior to adding concrete. CGFE will provide additional fill sand, if needed. b) Place #6, 6"x6" sheet type reinforcing wire mesh, sized to the hole. The reinforcing will be installed in the top 1/3 of the slab. c) Install 1/2" thick expansion material the full depth of the slab around the perimeter of the hole to provide a buffer to the existing concrete pads. d) Concrete will be screeded, edged, broomed and finished