Specifications include, but are not limited to: Contractor is responsible for any needed permits, drawings, and shall follow all local, State, and Federal codes. 2.Contractor shall field verify locations and measurements before submitting a bid. 3.Contractor shall also contact Miss Digg 811, before ground disturbance begins. 4.The areas to be repaired or replaced are marked in blue, with arrows/lines, x’s, or a stripe. 5.Locations marked with an X, are to be replaced. 6.Locations marked with a stripe are raised areas. These are to be ground to a depth equal to the surrounding sidewalk sections, to provide a level surface. If contractor determines that replacement is necessary, please bid accordingly. In addition, note in your bid these locations. 7.Locations marked with arrows/lines indicate the entire area within the arrows/lines is to be replaced. 8.Holes are marked with a circle and need to be filled or replaced. 9.Concrete sections that are to be replaced must be a minimum of 4 inches and 3500 psi minimum. Match width and provide a level surface with existing concrete.