Specifications include, but are not limited to: 1. Remove all existing roofing shingles and decking down to roof framing 100%. 2. Remove and replace any damaged or deteriorated fascia boards with like material. 3. Install new ½” Fiberboard on entire roof. 4. Install one layer of new ice and water guard over entire roof. 5. Install premium painted aluminum metal drip edging, pipe flashing and any step flashing required. 6. Remove and replace existing three with new curb-mount Tempered Low-E Velux Skylight units (Product #3434 with fixed glass). 7. Install skylight flashing blocks as required. 8. Install CertainTeed Landmark 30 year shingles in standard color of Owner’s choice. 9. All debris shall be removed and disposed of away from site. 10. Properly prepare for painting any new areas installed on project. 11. Apply new paint as recommended by manufacturer. Paint shall be suitable for exterior use. Work to include all trim, fascia, and soffit. 12. Paint color to be chosen by City. 13. All work to be completed in a workmanlike manner and shall be coordinated with Park staff so as not to interfere with Boat Launch operations.