Shingles Weatherwood IKO Exterior Trim White Sherwin Williams Siding Flagstone American Legend 4011997 1482047 Paint - General Lazy Gray Sherwin Williams Flat Paint - Kitchen; Bathroom Walls Lazy Gray Sherwin Williams Egg Shell Paint – Trim Dover White Sherwin Williams Satin Paint - Ceiling Dover White Sherwin Williams Flat Paint - Kitchen Ceiling Dover White Sherwin Williams Satin Paint - Bathroom Ceiling Dover White Sherwin Williams Egg Shell Countertop Laminate Madura Pearl Bulk Order Cabinets Slate Lexington - Maple Smart Special Order Carpet Maverick Traffic Master – Gallop H20277831200 1003067656 LVT Weathered Stock Chestnut Allure Plank 83312 1001297634 Provide gas and electric connection for stove. Provide gas and electric connection for dryer. Turn home into single family home with 3 baths and 4 bedrooms. First floor will have one bed and one bath. Second floor will have three beds and 2 baths. Plan for approximately 15-17 kitchen cabinets. Re-wire entire home to include new electrical panel and riser cables. Install all new plumbing to include all horizontal and vertical drains throughout the home to include replacing all basement floor drains. Provide a video scope of all floor drains. Install high efficiency furnace and hot water heater. Install all new duct work. Replace all damaged, water exposed, or rotten wood throughout home to include trusses, gut entire home to studs. Remove all walls in basement, paint basement ceiling black, dry-lock basement walls, paint basement floor gray. Remove chimney. Remove and replace bowing basement walls to include footings. Install French drain around perimeter of basement and sump pump Cap basement floor with 2 inches of cement over existing floor. Install a pull-down ladder in upper hallway for attic access. Exterior Install new gutters and downspouts. Install new siding, wrap fascia, install new soffit. Install all new windows and glass block windows. Replace roof and replace bad trusses. Replace entire sewer line from inside trap to the main sewer line. Install backflow preventer on sewer line. Provide video scope from cleanout to sewer main. Perform site cleanup and remove all trees touching home. Build wooden front porch. Build wooden rear porch. Demolish rear of home and rebuild to include staircase.