Specifications include, but are not limited to: Furnishing and installing approximately 2,100 linear feet of 16-inch diameter ductile iron water main, approximately 2,550 linear feet of 12-inch diameter ductile iron water main, and approximately 5,750 linear feet of 8-inch diameter ductile iron water main including service connections, valves, fittings, hydrants, and associated appurtenances at various locations in the City of Gardner. The work also includes furnishing and installing approximately 1,370 linear feet of 12-inch diameter PVC gravity sewer and six sewer manholes. The water main and gravity sewer will be laid in existing roadways and temporary and permanent pavement of all trenches is included as part of this Contract.