Specifications include, but are not limited to: The project delivery method for construction will be design-bid-build. The site of the Project is located at 70 St Botolph St., Boston, MA. The existing building is a 7-story steel framed structure with masonry exteriors consisting of 132 residential units and community spaces for the elderly/ disabled population. The building will be occupied during construction. New work includes miscellaneous site revisions, exterior envelope repairs and replacements, renovations to common areas and individual units and upgrades to fire protection, HVAC and MEP systems. BHA anticipates the notice to proceed (NTP) for Construction will be issued in September 2020 and construction will be completed within 730 calendar days from the date of the NTP.