Specifications include, but are not limited to: Design services to conduct a Feasibility Study which will include the development and evaluation of potential alternative solutions and continue through the Schematic Design Phase of the preferred alternative initially. As part of the Feasibility Study, the District would like to review the replacement of or an addition to the existing West Elementary School. In addition, as part of the Feasibility Study the District would like to examine an option to add a Pre-Kindergarten program to the school. As a result of the collaborative analysis with the MSBA regarding enrollment projections and space capacity needs, the District has identified that there is significant growth in elementary enrollment district-wide for the Town of Andover and a need for West Elementary School to absorb this growth. The MSBA and the Town agreed that the design enrollment of the proposed project at West Elementary School shall be based on the following: Grades K-5: 925 students (plus the potential for Pre-Kindergarten students)