Specifications include, but are not limited to: • Pre-construction survey and as-built construction plans • City/Town Coordination and Approval of Traffic Management Plans (TMP) • Environmental Permitting Requirements • Selective brush clearing and tree cutting • Demolition and excavation of existing at-grade crossing track, roadway and associated materials • Demolition of asphalt sidewalk approaches • Disposal of removed crossties, timbers and road crossing wood timbers • Disposal of existing roadway materials; concrete, steel, rubber, asphalt, etc. • Disposal and/or salvage of removed track material; timbers, rails, joint bars, plates, OTM • Asphalt saw cutting and asphalt milling of existing pavement • Full depth track construction • Wasting of excavated material along the Right of Way (ROW) • Furnishing and install new crossing crossties (7” x 9” x 8’-6”), (7” x 9” x 9’), (7” x 9” x 10’) • Furnishing and installation of signal conduit • Furnishing and installation of stone track ballast • Furnishing and construction of at-grade crossing track structure through crossing • Surfacing, lining and tamping track through the grade crossings and approaches • Furnishing and installation of rubber rail seal/asphalt crossings • Furnishing and installation of pre-cast concrete grade crossing panels • Furnishing and installation of Hot Mix Asphalt (HMA) pavement roadway and sidewalk surfaces • Furnishing and installation of HMA sidewalks, curbing and ADA Detectable Warning Panels • Drainage, ditching and cleaning & flushing of railroad drainage ditch pipe • Restoration of Railroad Right-of-Way and any disturbed adjacent areas associated with the construction • Removal and disposal of trash and debris • Cleanup of the work area • All other work associated with the Middleboro and Framingham Crossing Rehabilitation Project described in the Project Description and Scope of Work sections of the bid documents and shown on Contract Plans.