Specifications include, but are not limited to: 1. Remove and dispose of existing wood furring anchors, heavy duty tarps, and asphalt shingles down to roof deck. Replace any deteriorated roof deck as required. 2. Remove and dispose of existing asphalt shingles, flashing drip edge and underlayment to its entirety down to roof deck. Replace any deteriorated roof deck as required. 3. Remove and dispose of pipe vent flashing in its entirety. 4. Temporally disconnect existing lighting Protection system off roof before roofing work starts. Place and reconnect at the end of each Day to ensure properly grounded. Project Scope (New “Asphalt” roofing scope MI-2437-001): 1. Provide drip edge and “Grace” ice and water shield as indicated on drawings. 2. Provide roof underlayment and ice and water shield as indicated on drawings. 3. Provide life time Architectural shingles as per manufacturer and indicated on drawings. 4. Provide Hip and Ridge caps indicated on drawings. 5. Provide rolled ridge vents as indicated on drawings. 6. Provide vent pipe flashing as indicated on drawings. 7. Provide fall protection anchors as indicated on drawings. . 8. Provide expansion joint flashing as indicated on drawings. 9. Provide metal wall/step flashing as indicated on drawings. 10. Provide new rain diverters over doors as indicated on drawings. 11. Provide new membrane roof and tie-in to Asphalt shingles roof as indicated on drawings. 12. Reinstall lightning rods and ensure proper grounding as indicated on drawings.