Specifications include, but are not limited to: Perform monthly inspections at each of the seven wastewater pumping stations and at the two water pumping stations to systematically inspect and operate all electrical, control and mechanical equipment. Document operator’s inspection and maintenance and other aspects of the pump operation that have been evaluated, using a custom data logging system. Inspectionsshall include, but are not limited, to the following: a) Interior and exterior of the pump station area b) Electrical panels c) Operation of the electricalsystem d) Operation of the heating, ventilation and dehumidification systems e) Operation of instrumentation and controls including level controls, alarm functions (local annunciators), call out and telemetry f) Observe an on load test of the stand-by generators for a minimum of 20 minutes to check their operation and inspect for any deficiencies