Specifications include, but are not limited to: Littleton High School Sidewalk Reconstruction Project - The scope of work includes the reconstruction of the existing sidewalk at the Littleton High School. This project will include approximately 1,000-feet of sidewalk reconstruction located along the north face of the school and along the student drop off driveway. The existing sidewalk will be replaced with new cement concrete sidewalk and granite curbing. Existing granite curbing will be removed and reset. Cement concrete wheelchair ramps with detectable warning panels will also be constructed where applicable. All sidewalk elements will be constructed to meet ADA & MAAB standards. A new cement concrete dumpster pad will also be constructed.