Specifications include, but are not limited to: 1. The removal and legal disposal of all materials at areas designated to be renovated, or abutting new work, as required to complete the work, including but not limited to, existing windows and the west elevation storefront system, as indicated on the drawings. Note: All work designated to be completed on the first floor shall be BASE BID work, and all work designated to be completed on the 2nd floor shall be ALTERNATE NO. 1 work. 2. Windows shall be removed and coordinated with the installation of new windows in such a manner that the work is completed in one workday. Overnight temporary protection will not be allowed without prior approval of the owner. 3. Contractor shall provide all temporary shoring necessary to support surrounding masonry effected by the removal of the windows. 4. All permanent site features, including trees and monuments, adjacent to the construction shall be protected from damage during the course of this project. 1. Clean site; sweep paved areas, rake clean landscaped surfaces. 2. Remove waste and surplus materials, rubbish, and construction facilities from the site. 3. The Contractor shall clean all walls, windows or other building and grounds elements that have been affected by his work. 4. Repair, patch and touch-up marred surfaces to specified finish to match adjacent surfaces.