Specifications include, but are not limited to: Dismantle, removal and disposal of the Turbo Power Oil Fired 900-gallon water heater. Dismantle, removal and disposal of all water heater controls to include burner and adjoining parts not necessary for new installation. Preparation and or alteration of support pad to accommodate new installation. Installation All installation and associated work shall include in addition to components listed below, but not limited to: a. All piping is to be insulated with (1) inch fiberglass insulation with PVC fittings. b. All piping domestic water shall be Type āLā copper with pressure fittings. Any mixing valves and hot water return pump shall be connected to the new tank. c. The flue piping from boiler to the existing metal chimney vent shall be twenty four (24) gauge galvanized smoke pipe. d. Contract to include all wiring of the boiler, tank, pump, controls and the like. e. All other Associated work may include, but is not limited to the disconnection of all hot and cold water lines to existing hot water unit, reconnection of all hot and cold water lines to new unit(s), removal of oil line to allow access and reconnection of oil line, electrical work, insulation and the like. Boiler Type Furnish and install Viessmann Bitorond 100, VR-245 Triple-Pass Cast Iron Boiler or Equivalent Approved by the Owner. Burner Type Furnish and Install Riello F10 (VB2-50) matched oil burner or Equivalent Approved by the Owner.