Specifications include, but are not limited to: All work required to construct Flax Pond Phase III Site Improvements Project including all work required for site preparation and removals including removals and disposal of existing pavements, tree removal, and other miscellaneous items; clearing and grubbing; furnishing, installing, and maintaining erosion controls; rough and fine grading of all areas identified within the area of work including furnishing and installing loam and seed; preparation of the base and furnishing and installing new bituminous concrete pavement, concrete walk, chain link fences and gates, pickleball posts, nets, and appurtenances; drainage pipe and drain basin; and furnishing and installing all other miscellaneous work to provide all improvements as described in the contract documents.