Specifications include, but are not limited to: Provide and install matching color vinyl transition strips between rooms of dissimilar material. e. Full floor preparation to receive the new floor coverings. f. The temporary relocation of furniture, within the facility, to complete the flooring work. g. Substrate repairs to a structural crack that spans the Corridor and Reception desk abutting the Lobby Space -115 will require crack grinding, backer rod placement, caulking and a slip cover to support the new carpeting. h. Placement of the sheet vinyl flooring in Rooms 113 and 114 shall begin along the wet fixture walls with an integral coved 6” base. The remaining walls shall receive a standard flat 6” base. The longitudinal seams will be double-cut and welded butt to butt. ; Provide and install matching color vinyl transition strips between rooms of dissimilar material. k. Provide and install new color compatible vinyl base in all carpeted areas. l. Vacuum clean all finished areas.