Specifications include, but are not limited to: The Work of this Contract generally consists of the construction of 6,550 linear feet of 12-inch diameter ductile iron water main installed from the Moose Hill Tank to Greenville Street, along Greenville Street to Main Street, along Main Street, along Cherry Street, and all associated service connections, valves, fittings, hydrants, and appurtenances. The project includes Additive Alternate A for 970 linear feet of 8-inch diameter ductile iron water main on Greenville Street (from approximately 25 Greenville Street to approximately 43 Greenville Street) and all associated service connections, valves, fittings, hydrants, and appurtenances. Temporary by-pass piping shall be used during water main construction on Main Street, Greenville Street, and Cherry Street. The work also includes connecting to the water main at the existing water storage tank, and rehabilitation of an existing concrete vault at the water storage tank site.