Specifications include, but are not limited to: The Work of this Contract consists of the installation of a 0.4 MG capacity welded steel elevated spheroid water storage tank in West Newbury, Massachusetts including associated piping and appurtenances, electrical work, a tank mixing system, site work, gravel access road, and an underground electrical and communications duct bank (approximately 1,800 linear feet) including conduit and handholes. Piping shall consist of approximately 30 linear feet of 12-inch diameter ductile iron water main to connect to a new 12-inch diameter ductile iron water main recently installed by others. Other work includes demolition of the existing 0.32 MG capacity riveted steel standpipe water storage tank.