Specifications include, but are not limited to:. The work includes installation of water mains and service connections on streets including Shaw St, Edgemont Rd , Sheppard Av, Cotton Av, both ends of Somerville Av, Hillcrest Rd, Dewey Rd, Logan Dr and possibly additional streets if funding is available. The work on all of the roadways will include full-width reclamation, excavation, grading, placement of a 2 ½ inch bituminous “dense binder” pavement including neat transitions to abutting driveways, streets and other features. The existing and proposed water mains in Shaw Street and Cotton Avenue run alongside critical 16 inch gas transmission lines operated by either Algonquin / Spectra Energy or National Grid (both on Shaw Street) which cannot be interrupted, and work nearby must be conducted with appropriate gas company representatives present. It is anticipated that crossing water services to adjacent buildings may have to be “pulled” or installed utilizing handwork excavation and compaction methods. Controlled density fill may be employed if allowed by the gas utility owner, but is generally not allowed by them