Specifications include, but are not limited to: The work to be performed under this contract includes, but is not limited to, furnishing all necessary labor, materials and equipment required to perform various roadway improvements. The scope of work includes reclaiming of existing pavement, full-depth roadway reconstruction, fine grading and compacting of sub-grades, excavating and disposing of concrete curb and excess roadway materials, new drainage system installations, new granite curb installations, milling of existing pavement and installing hot mix asphalt base, leveling and top courses on several streets located in the Town of Barnstable, MA. The work also requires site preparation, repair and adjustment of drainage structure castings and gate boxes, street sweeping, application of asphalt tack coat, construction-related safety signage, minor restoration work, and all other related activities whatsoever required to complete the roadway improvements as specified. herein, and as directed by the Engineer.