Specifications include, but are not limited to: The work to be performed under the Base Bid of this contract includes, but not limited to, watermain installation and related appurtenances for the 2020 PERMANENT COMM INTERCONNECTION at Hyannis, MA. The related appurtenances include the relocation of the existing pump station, removal and relocation of hydrants, removal of existing private utility pole, installation of water main, gate valves and valve boxes, sample lines with PVC conduit, pavement patch, building foundation for the new station, a new building enclosure to the existing metal container, an emergency eyewash with tepid water, loam and seed, various trees and plantings, dense blended crushed stone base driveway and parking area at the new pump station site.