Specifications include, but are not limited to: The intent of this project is to replace florescent lamps and ballast with LED tubes that will not require the ballast. The old ballast shall be removed and any broken lamp holders will be replaced before installing the LED tube. The contractor will provide and install the first 25 shunted lamp holders to replace broken lamp holders as part of the base bid. A replacement cost for additional shunted lamp holders will be provided in the bid. The contractor will be responsible for changing out non shunted sockets if broken or will wire externally non broken sockets so that they will act as a shunted socket. The disposal of old lamps and old ballast will be the responsibility of the successful bidder. For spaces that call for replacement fixtures, old fixtures are to be removed and replaced according to lighting survey. New fixtures will be provided by the owner. Where a reduction in the number of fixtures occurs, consult with owner before installation on placement of the new fixtures which should be in accordance with best practice. Verify that electrical installation be in complete accordance with all pertinent codes and regulations and the original design. All fixtures are to be grounded per NEC.