Specifications include, but are not limited to:The Work generally consists of cleaning and redevelopment of the two gravel packed wells at Station No. 1 and Station No. 2, providing pump discharge piping upgrades at Station No. 1, and furnishing and installing a permanent sodium hypochlorite chemical feed system at each of the five pump stations, Station No. 1 through Station No. 5, including chemical day tanks, metering pumps, and associated piping, fittings, and appurtenances. The Work includes the electrical, instrumentation, and controls required for the new chemical feed system at each station, and SCADA system upgrades at each pump station and at the master telemetry unit (MTU) at the Water Department Office.