Specifications include, but are not limited to: Phase 1 -existing 5K sq ft Data Center space Infrastructure Assessment: Evaluate the existing data center infrastructure, including cooling, fire suppression, and power systems. Review and identify performance bottlenecks, vulnerabilities, or areas for improvement. Capacity Planning: Assess current capacity utilization and scalability. Provide recommendations for optimizing resource allocation. Security and Compliance: Evaluate security measures, access controls, and compliance with industry standards (e.g., ISO 27001, NIST). Assess current security controls, (i.e. surveillance systems, perimeter security, IDS etc) and identify any upgrades or replacements necessary. Identify any gaps and propose remediation strategies. Disaster Recovery and Business Continuity: Review disaster recovery failover capabilities. Identify any upgrades or replacements necessary to support existing capacity. Identify any gaps and propose remediation strategies. Energy Efficiency and Sustainability: Assess energy consumption, cooling efficiency, and environmental impact. Identify any upgrades or replacements necessary to support existing capacity. Propose energy-saving initiatives. Viability Assessment: Evaluate the long-term viability of the current infrastructure. Consider factors such as technology obsolescence, vendor support, and future scalability. Replacement Costs: Estimate the costs associated with upgrading or replacing components to support existing capacity over a 10-year period. Include hardware, software, and labor expenses...