Specifications include, but are not limited to: 1. Cut existing single ply membrane into a ten by ten grid to prevent condensation 2. Inspect under lying insulation and replace if needed. Note: Minimal insulation, if any, is expected 3. Furnish and install new pressure treated wood nailers at the perimeter. 4. Furnish and install new one inch polyisocyanurate roof insulation over the existing roof and existing insulation. 5. Furnish and install a new GAF (or equal) .060 thick white TPO Rhino-bond mechanically fastened roof system complete with all associated flashings. 6. Furnish and install new .040 aluminum edge metal at the perimeter of roof 7. Include Prevailing Wage and required reporting 8. Furnish owner with a twenty five (25) year warranty on labor and material. 9. Obtain building permit