Specifications include, but are not limited to: 1. Work under this contract is located in the Town of Ayer, Massachusetts, at and near Pirone Park. The Project consists of Phase II of the recreational path construction, as shown on the attached Drawings and included in the Specifications, and including but not limited to: a. Excavation and grading. b. Backfill, compaction, surface course, and all associated work required for a fully functional recreational path. c. A proposed concrete block retaining wall is shown behind the backstop of the upper ball field; however, the Contractor may install the path without the retaining wall if he can demonstrate that ADA standards and a 3:1 (Horizontal:Vertical) minimum slope on either side of the paved path can be maintained. 2. Completed work shall meet Americans with Disabilities Act (ADA) Standards. B. Restoration of Disturbed Areas 1. The Contractor is responsible for the restoration of all areas disturbed by the work to an equal or better condition than that encountered prior to construction. 2. Pirone Park has an irrigation system for the fields. The Contractor shall coordinate the location of the irrigation system with the Parks Department in order to avoid damaging the system.