Specifications include, but are not limited to: Remove and replace existing metal roof panels, Area A; Remove and replace existing metal roof panels, Area B, Area C, Area D. A. The Contractor shall install temporary fencing, warning lines, barriers and the like, as required, to segregate the construction areas from existing facilities, occupants and the public. In the event that access cannot be interrupted in the construction area, the Contractor shall provide protection above doorways and walks in the construction area ; A. The Contractor shall supply adequate covered receptacles for waste, debris and rubbish. B. All receptacles must be immediately removed from the site when full. C. The grounds in the area of the receptacle must be cleaned prior to moving the receptacle to another location on the project. Disposal shall be off-site in a legal dump intended for that use.