Item 1: Mobilization and Demobilization (FIXED, Lump Sum Cost, Maximum 5% of Items 2 Through 10) $ (a) Item 2: Pre-Construction Site Meetings (EACH, Total of Item 2 Cannot Exceed Maximum 10% of Items 3 Through 10) $ x 100 = $ (b) Item 3a: 1-Inch Copper Type K Water Service Tubing (Public Side) (LF) $ x 525 = $ (c) Item 3b: 1-Inch Copper Type K Water Service Tubing (Private Side) (LF) $ x 4,975 = $ (d) Item 3c: 2-Inch Copper Type K Water Service Tubing (Public Side) (LF) $ x 250 = $ (e) Item 3d: 2-Inch Copper Type K Water Service Tubing (Private Side) (LF) $ x 675 = $ (f) Item 4a: 1-Inch Corporation Stops (EACH) $ x 96 = $ (g) Item 4b: 2-Inch Corporation Stops (EACH) $ x 4 = $ (h) Item 5a: 1-Inch Curb Stops & Boxes (EACH) $ x 96 = $ (i) Item 5b: 2-Inch Curb Stops & Boxes (EACH) $ x 4 = $ (j) Item 6a: 1-Inch Ball Valve & Connections at Meter (EACH) $ x 96 = $ (k) Item 6b: 2-Inch Ball Valve & Connections at Meter (EACH) $ x 4 = $ (l) Item 7a: Exploratory Excavation (CY) $ x 550 = $ (m) Item 7b: Excavation of Unsuitable Materials Below Trench Grade (CY) $ x 60 = $ (n) Item 7c: Rock Excavation (CY) $ x 60 = $ (o) Item 7d: Select Fill (CY) $ x 120 = $ (p)