Specifications include, but are not limited to: 1. Demolition of Existing Well Building B and Well Building A2. 2. Temporary water main bypass piping for Well A2. 3. Construction of a GAC Treatment Building as an addition to the existing Treatment Support Building. Equipment to be housed within the GAC Treatment Building includes, but is not limited to, six pressure GAC vessels and ancillary valves and piping, Well B, well pump and motor, electrical equipment, and HVAC equipment. The GAC Treatment Building will be integrated into the existing security system. 4. Piping modifications within the existing Water Treatment Plant Building including connections for the washwater supply, filtered water and treated water to the existing ultraviolet disinfection units. 5. Raw water piping modifications within the existing Treatment Support Building. 6. Replacement of the existing HVAC equipment for the fluoride room within the existing Water Treatment Plant. 7. One cast-in-place below-grade concrete reclaim tank No. 3 housing a pair of duty standby submersible recycle pumps. 8. A single story Well A3 replacement building, to house but is not limited to, Well A3, well pump and motor, electrical equipment, and HVAC equipment. The new Well A3 building will be integrated into the existing security system. 9. Upgraded and expanded SCADA system. 10. Yard work including new paved roadways and parking area, water mains, sanitary sewer, storm drains, site lighting and electrical distribution system modifications.